Connect

Repair and Refurbish

This phase includes projects to repair and refinish the interior of the house to ensure it can be used by the community. Safety is the primary focus with electrical and fireplace repairs. The projects were funded by donations, valued at approximately $15,000.

Completed

Fireplace mortar, dampers and chimney and repair
Mail hall ceiling painted (after water damage from leaking roof) by CeilSpray of Manchester NH
Ceiling panels replaced as needed
Electrical inspection of everything
Installation of ground fault switches
Replacement of main hall ceiling fixtures (many were broken)
Basement lighting installed
Electrical switches/outlets replaced
Storage cabinets in back of hall

In Process

Restoration of 1930 benches - a Cub Scout and Girl Scout project

To Be Done

Refinish of main hall walls
Replacement of hot water heater
Installation of basement water detection system